Florida-licensed Professional Engineering Firm · Miami-Dade & Broward
Led by a Florida-licensed Professional Engineer with municipal engineering and regulatory experience, Mimik Solutions understands the recertification, permitting, and compliance process from both the applicant and agency perspectives.



One licensed firm for the work that needs it most: building recertifications, BSIP inspections, engineering certifications, and traffic studies. Engineering services coordinated through one responsive point of contact, with signed-and-sealed deliverables prepared by the appropriately qualified professionals.

Miami-Dade 40-year and 30-year building recertifications. Fixed-fee proposal the same business day, sealed report within 48 hours of the inspection.

Broward Building Safety Inspection Program compliance for buildings 25 years and older. Structural and electrical inspections, sealed and submitted for you.

Signed and sealed PE certification letters for permits, inspections, and lender or city requirements. Turned around fast when you’re on a deadline.

Traffic impact studies and statements for site plan approvals and permitting, prepared by a licensed transportation engineer who knows what your reviewer wants.
Mimik Solutions is a Florida-licensed Professional Engineering firm specializing in building recertifications, structural and electrical safety inspections, engineering certifications, and regulatory compliance. Our additional Florida Certified General Contractor license provides practical knowledge of permitting and corrective-work requirements, while our client services remain engineering-focused.
Every report and letter is inspected, signed, and sealed by the licensed engineer of record.
Verify license on DBPR →
Submit your project details or inspection notice, and we’ll review your requirements, answer any initial questions, and identify the engineering services needed for your project.
We’ll prepare a detailed proposal outlining the recommended scope of services, pricing, estimated schedule, and next steps—typically the same business day.
We perform the required engineering services, prepare the signed-and-sealed deliverables, and support the submission and review process through completion.
Still have a question? Send us a message through the form below. We reply the same business day.
Miami-Dade and Broward counties only, including the County and every municipality within each: Miami, Miami Beach, Hialeah, Coral Gables, North Miami, Fort Lauderdale, Hollywood, Pembroke Pines, Pompano Beach, and every other city.
They are separate county programs with different rules. Miami-Dade’s building recertification (formerly the 40-Year Recertification) requires structural and electrical inspections at 30 years of age, or 25 years for qualifying coastal buildings, and every 10 years thereafter. Broward’s Building Safety Inspection Program (BSIP) inspects buildings at 25 years of age and every 10 years after. In both counties the inspection is structural and electrical, and we prepare the sealed report to that county’s guidelines.
Fixed-fee proposal the same business day, inspection scheduled within 2–5 days of your request, and a signed and sealed report within 48 hours of the inspection. Most owners go from sending us the notice to having a report submitted in under two weeks.
The property address and your email. If you received a notice from the county or your city, send a copy so the proposal matches exactly what it asks for.
We document the conditions and explain the corrective work required before certification. Depending on the findings, this may include structural repair documents, electrical recommendations, permit-support documents, or additional evaluation. We can coordinate with the property owner’s licensed contractors and provide the follow-up engineering inspections after the work is completed.
Yes. Certification letters are signed and sealed by a Florida-licensed Professional Engineer and delivered as a submission-ready PDF within 24 hours of the review, or of the site visit when one is required. Traffic studies are prepared to your jurisdiction’s methodology, and most are delivered within two to three weeks of authorization.
Tell us about your property, notice, or engineering requirement. We will review the information and respond with the recommended scope and next steps.